Urban & Rural street works

Overview

Keltic TM provides comprehensive traffic management services on highways and rural roads from basic works to multi phased complex traffic schemes in traffic sensitive areas, working to National Highways Sector Scheme 12A/B/D requirement.

We work closely with the relevant local authority to obtain permits, discuss provisional traffic management schemes, and then produce detailed drawings for their approval. We also ensure that necessary bodies such as emergency services, statutory utility companies, schools etc. are consulted.

Using our expertise, the latest technology and working with stakeholders we will design custom schemes that will ensure the smooth flow of traffic and safe movement of pedestrians.

Attention to detail

We recognise the often over-looked, complexities associated with NHSS 12D inner city and urban work where consideration often needs to be given to complex junctions, busy traffic flow and pedestrian movement.

Fully qualified operatives

The traffic management scheme is set up and works are carried out by our fully qualified operatives with inspections from the local authority representatives.

Clients

Keltic TM will work closely with clients and the local authority to gain permit and road space approval.  We will ensure consideration is given to particular surroundings such as schools and community areas; liaise with stakeholders including utilities, TFL and emergency services as required. We will then implement, manage, and remove the temporary traffic and pedestrian management to meet the requirements of the contract.

Keltic TM`s clients include Civil Contractors, Resurfacing Contractors, Utility Contractors or any client who has an impact on the highway.

Expertise

Across all works delivered by Keltic TM, we provide a free Site Survey, Risk Assessment and Method Statement, offering further reassurance your project will be completed to high safety standards.

To give you further piece of mind all of our traffic lights have trackers fitted and are constantly monitored which allows us to see the battery levels and if they are even moved 2 meters from where they should be.

High speed

Overview

At Keltic we understand there is no ‘one size fits all’ approach. We treat all customers as individuals and take the time to understand your needs in order to determine the best solution for you. Our range of High Speed traffic management products and services includes:

REGIONAL DEPOTS

Main Office – Unit 1 Link Park Heathrow, Thorney Mill Rd, West Drayton, UB7 7EZ

The Barn, 70 Wrecclesham Hill, Farnham GU10 4JX

112 Beddington Lane, Croydon CR0 4TH

Keltic Yard, Eurostorage Compound,
Canal Way, Notting Hill, W10 5AZ

Copyright © 2024. All Rights Reserved.